Jun 30, 2022 | PSA, Service Disruptions, Uncategorized
The Barbados Water Authority wishes to inform residents of St. Peter and St. Lucy that it will be making an 8-inch connection between the Lamberts junction and Date Tree Hill on Friday, July 1st between 9 am and 6 pm. As a result, residents and businesses located in ...
Jun 21, 2022 | PSA, Service Disruptions
The Barbados Water Authority (BWA) updates today Tuesday, June 21st that it has resumed pumping from its well pumps at the Bowmanston station. Once levels in the reservoir improve, the water will begin to flow into the distribution network and into customers’ taps...
Jun 20, 2022 | PSA, Service Disruptions
The Barbados Water Authority (BWA) advises today, June 20th that it is has been forced to stop pumping from its Bowmanston station because of low reservoir levels being experienced at the facility. As a result, customers in some St. John districts may be impacted by...
Jun 17, 2022 | PSA, Service Disruptions
The Barbados Water Authority wishes to advise residents and businesses in St. Lucy that on Monday, June 20th it will be resuming its swabbing exercise on the 8-inch water main located between Half Acre and Josey Hill, St. Lucy. Swabbing will be conducted during the...
Jun 15, 2022 | PSA, Service Disruptions
The Barbados Water Authority informs residents of Round Rock, St Lucy that it will be making a 4-inch connection in the area on Friday, June 17th between 10:00 am and 6:00 pm. As a result, residents and businesses located in Round Rock and the immediate surrounding...
Jun 6, 2022 | PSA, Service Disruptions
The Barbados Water Authority wishes to advise that the power supply to its Lodge Hill Pumping Station has been disrupted and the station is offline. The team from the Barbados Light and Power is working to have service restored. In the interim, customers in the...