Dec 20, 2023 | PSA, Service Disruptions
The Barbados Water Authority, today, Wednesday, December 20th informs residents and businesses in parts of St. Philip and Christ Church that the Pumping Station, which supplies them with water, has been taken offline to conduct emergency repairs. As a result,...
Dec 20, 2023 | PSA, Service Disruptions
The Barbados Water Authority (BWA) wishes today, Wednesday, December 20th, to report that pumping has resumed at its stations after a weather-related stoppage. It may take some time for normal supply to be restored to all of the affected St. George, St. John, and St....
Dec 18, 2023 | PSA, Service Disruptions
The Barbados Water Authority today, Monday, December 18th, advises some St. George, St. John and St. Philip residents that due to the ongoing inclement weather some of its facilities have been taken offline. This action is being taken to prevent discoloured water from...
Dec 13, 2023 | Uncategorized
Civil Works for the Rehabilitation of Storage Tanks, Reservoirs, and Pumping Stations and the Installation of a Power Generation and Turbidity Control System Link to document: Contract Award Notice – Civil Works – 2.1 – December 12, 2023...
Dec 13, 2023 | Uncategorized
Consultancy to Develop a Potable Water and Sanitation Master Plan for Barbados Link to document: Contract Award Notice – Master Plan – 1.1 – December 12, 2023 (2)