This evening Sunday, February 27th Charles Leslie, Director of Engineering at BWA is happy to report that the repair work carried out by Ionics at the Desalination Plant was successful and is completed.

Their systems are now fully online and will operate slightly above normal capacity for a day or two to ensure the distribution system is fully charged before reducing to normal production levels.