Today, Friday, January 30th 2026, the Barbados Water Authority (BWA) wishes to advise the public that late last night it completed repair work conducted on a main in Holetown, near the Royalton Vessence Hotel.
As a result, this morning the road has been reduced to a single lane for vehicular traffic. Work to reinstate the area is expected to be completed as soon as possible, weather permitting.
The BWA apologies for inconvenience this repair work may cause. (ENDS)